2016-06-18
Team WOD @ 9am
*Teams of 2
For time:
400m run together
Partner A: 20 KB swings (1.5/1)
Partner B: 20 box jumps (24/20)
*Work at same time and switch after completed so that both partners complete each movement
400m run together
A: 5 rope climbs
B: 35 wallballs (20/14)
*Work at the same time and switch
400m run together
A: 100 D/U (Scale: 200 S/U)
B: 50 sit-ups
*Work at the same time and switch
400m run together
25 pull-ups
25 goblet squats (1.5/1)
*Work at the same time and switch
Time: 31:14 Rx (with Kat)
Leave a Reply